Ackerman-Estvold: Engineering and Management Consulting, Inc.
Facebook Twitter RSS Linkedin
Ackerman Surveying & Associates, Inc.
projects
Capabilities Careers and Culture Projects About Us
Loading
Sign-Up News Bidding Documents Contact Us Home
6th Street Underpass - Minot, ND
Tags: 6th Street UnderpassConstruction Engineerinminot


In early 2006, Ackerman-Estvold was selected by the City of Minot to begin design engineering on the 6th Street Underpass reconstruction. The reconstruction was needed due to problems with recurring flooding and low overhead. Since that time, the project has been delayed several times as a result of a variety of factors, including funding source availability, and the 2011 flood. The project was recently reignited and the design phase was completed in 2012, and construction began in the spring of 2013. Construction is scheduled to be competed in the spring of 2014.

Project features include a new storm sewer lift station, large pump station, concrete pavement, street lighting, signalization, and limited water and sewer replacement in areas where older infrastructure is failing.

We will continue to add photographs as the construction phase continues.